Weight saved
3,232 lb
71% less material to move, place and stand on
Steel4,572 lb
Durabar1,340 lb
Takeoff
Compare your current mesh or rebar against Durabar GFRP on weight, installed cost and cost over the life of the slab.
Weight saved
3,232 lb
71% less material to move, place and stand on
Ultimate vs yield
2.00×
the tensile capacity per foot of #3 rebar @ 12 in o.c.
GFRP ultimate 120 ksi compared with steel yield 60 ksi. Not an ACI 440.11 design stress.
Cost over the life of the slab
−$3,631
lower across years 8 through 35
At 12 in o.c. Durabar Carpet #3 delivers 2.00× the tensile capacity per foot of #3 rebar @ 12 in o.c.. ESR-5501 caps Durabar at 12 in o.c. Judge it on capacity per dollar, weight and service life.
Name, email and company unlock installed cost, CO₂ and the line-by-line takeoff. We use this to follow up about the job.